Post date System Status: Update Notes
2016-08-31 - 06:29 PDT Offline

Bugaboo Downtime: Aug. 31, 6am (Pacific)

The Bugaboo facility will be shutdown on Aug. 31 at 6am (Pacific). The electrical panel that feeds the cooling system needs to be rewired in preparation for the installation of the GP2 system. The downtime is expected to last for about 12 hours.

2016-08-30 - 14:50 PDT Downtime Scheduled

Bugaboo Downtime: Aug. 31, 6am (Pacific)

The Bugaboo facility will be shutdown on Aug. 31 at 6am (Pacific). The electrical panel that feeds the cooling system needs to be rewired in preparation for the installation of the GP2 system. The downtime is expected to last for about 12 hours.

2016-08-27 - 16:18 PDT Downtime Scheduled

Planned outage scheduled at 6AM-8PM PDT on August 31, 2016

Bugaboo Shudown, Aug. 31, 6:00am

We need to shutdown the Bugaboo system on Wednesday, Aug. 31. The electrical panel that feeds the cooling system needs to be rewired as part of the GP2 construction process. The outage is expected to last for about 12 hours. We apologize for the inconvenience.

2015-12-09 - 18:40 PST Online

SFU Scheduled Power Outage

Due to a damage caused the wind storm on Sunday, BC Hydro will perform a maintanence work today between 7AM and 12PM PST. SFU main campus will be out of power during this period. We do not expect bugaboo cluster to be affected by the outage, but access to ownCloud will not be available.

Update: as of Dec. 11, 14:00 (PST) everything is operating normally.

2015-12-08 - 04:48 PST Conditions

SFU Scheduled Power Outage

Due to a damage caused the wind storm on Sunday, BC Hydro will perform a maintanence work today between 7AM and 12PM PST. SFU main campus will be out of power during this period. We do not expect bugaboo cluster to be affected by the outage, but access to ownCloud will not be available.

2015-12-07 - 04:01 PST Online

Bugaboo currently unavailable - Dec. 6, 21:00

The wind storm that currently moves through the Vancouver area has caused a power outage in the datacentre that houses the Bugaboo facility. The system is unavailable until further notice.

Update, Dec. 7, 4:00

Power was restored around 1:00am and the system was brought online around 4:00am.
All jobs that were running at the time of the power outage were terminated. Please, resubmit these jobs.

2015-12-06 - 21:17 PST Offline

Bugaboo currently unavailable - Dec. 6, 21:00

The wind storm that currently moves through the Vancouver area has caused a power outage in the datacentre that houses the Bugaboo facility. The system is unavailable until further notice.